UK Building Costs 2026
How Much Does It Cost to Build?
Realistic cost ranges for every major type of UK construction project — from house extensions and loft conversions to new builds, barn conversions and commercial fit-outs.
How Much Does a House Extension Cost?
£20,000 – £150,000+Quick answer (updated October 2026): Most house extensions cost £20,000–£150,000+ in 2026. A single-storey rear extension typically runs £1,500–£2,800 per m² (£30,000–£70,000 in total), and a double-storey £1,300–£2,500 per m² (£50,000–£120,000), depending on size, specification and location.
A house extension is one of the most popular ways to add space and value to a property without moving. Costs vary enormously depending on the type, size and specification — a small single storey rear extension is very different financially from a large double storey wrap-around.
The figures below are construction costs per m² for the Midlands. Add 15–30% for London and the South East, 5% for the South West, and subtract 8–15% for the North, Wales and Northern Ireland.
| Extension Type | Cost per m² | Typical Total |
|---|---|---|
| Single Storey Rear | £1,500–£2,800 | £30,000–£70,000 |
| Double Storey | £1,300–£2,500 | £50,000–£120,000 |
| Side Return | £1,600–£3,000 | £25,000–£55,000 |
| Wrap-Around (L-shape) | £1,700–£3,200 | £60,000–£150,000+ |
What Affects the Cost?
- Floor area — the single biggest factor
- Specification: standard brick vs feature glazing, bi-fold doors, lantern roofs
- Groundworks — deeper foundations, proximity to drains or trees
- Kitchen or bathroom inclusion adds £8,000–£25,000+
- Structural steelwork to open up the existing house
- Region — London adds 15–30% to all construction costs
- Roof type — flat roof is cheaper; pitched or vaulted costs more
How Much Does a Loft Conversion Cost?
£15,000 – £100,000+Quick answer (updated October 2026): A loft conversion typically costs £15,000–£100,000+ in 2026: £15,000–£25,000 for a Velux conversion, £30,000–£65,000 for a dormer, £35,000–£70,000 for a hip-to-gable and £55,000–£100,000+ for a mansard, depending on size, specification and location.
A loft conversion is typically the most cost-effective way to add a bedroom — you're using existing roof space without extending the building footprint. The type of conversion matters enormously: a simple Velux conversion barely alters the roof structure, while a mansard conversion essentially rebuilds it.
Most conversions require building regulations approval but fall within permitted development rights, meaning no planning permission unless you're in a conservation area or flat conversion.
| Conversion Type | Typical Cost | Best For |
|---|---|---|
| Velux / Roof Light | £15,000–£25,000 | Storage / study, high head height |
| Dormer | £30,000–£65,000 | Full bedroom + en-suite |
| Hip-to-Gable | £35,000–£70,000 | Semi-detached / detached houses |
| Mansard | £55,000–£100,000+ | Maximum space, terraced houses |
What Affects the Cost?
- Conversion type — Velux vs dormer vs mansard
- Existing roof pitch — steeper = more usable headroom
- Bathroom / en-suite addition: £6,000–£15,000 extra
- Staircase design and impact on floor below
- Structural ridge beam or steel requirement
- Number and size of dormers
- Insulation level (Part L compliance for new regulations)
How Much Does It Cost to Build a New House?
£1,500–£3,500 per m²Quick answer (updated October 2026): Building a new house typically costs £1,500–£3,500 per m² in 2026, excluding land. A typical three-bed detached house costs around £216,000–£360,000 to build, a semi-detached £160,000–£270,000 and a terrace £135,000–£234,000, depending on specification and location.
Building a new house from scratch gives you full control over the layout, specification and energy performance. Construction costs (excluding land) typically run from £1,500/m² for a straightforward build to over £3,500/m² for premium or complex projects.
VAT is usually zero-rated on new residential construction, which is a significant saving. Don't forget to budget for land, utility connections, architect fees, planning and building control — these can add 20–30% on top of the build cost.
| Property Type | Cost per m² | Typical 3-bed total |
|---|---|---|
| Detached House | £1,800–£3,000 | £216,000–£360,000 |
| Semi-Detached House | £1,600–£2,700 | £160,000–£270,000 |
| Terraced House | £1,500–£2,600 | £135,000–£234,000 |
| Bungalow | £1,900–£3,200 | £228,000–£384,000 |
What Affects the Cost?
- Structural form — timber frame is typically faster and comparable cost to masonry
- Ground conditions — poor ground or contamination adds significant cost
- Specification — standard finishes vs bespoke kitchen, premium glazing
- Energy performance target (Passivhaus costs more upfront)
- Utility connections — remote plots may need new connections
- Number of storeys — bungalows cost more per m² (large roof + foundation vs floor area)
- External works: landscaping, driveway, drainage
How Much Does a Basement or Cellar Conversion Cost?
£25,000 – £200,000+Quick answer (updated October 2026): Basement projects typically cost £25,000–£200,000+ in 2026. For around 40 m², converting an existing cellar costs about £25,000–£80,000, lowering a cellar with underpinning £40,000–£120,000, and excavating a new basement £100,000–£200,000+.
Basement projects fall into three categories: converting an existing cellar into habitable space (cheapest), lowering an existing cellar floor with underpinning, or excavating a brand new basement under an existing property (most expensive and complex).
Basements are high-risk projects — ground conditions, the water table, proximity to neighbouring foundations and access for excavation machinery all drive significant cost variation. Allow a 15–20% contingency.
| Type | Cost per m² | Typical Range (40 m²) |
|---|---|---|
| Existing Cellar Conversion | £1,200–£2,600 | £25,000–£80,000 |
| Cellar Lowering / Underpinning | £1,800–£3,800 | £40,000–£120,000 |
| New Excavated Basement | £2,500–£5,000 | £100,000–£200,000+ |
What Affects the Cost?
- Type — conversion vs new dig is a 2–4× price difference
- Ground conditions and water table depth
- Waterproofing system: tanking vs cavity drain membrane
- Access for excavation machinery (terraced house = very difficult)
- Party wall agreements with neighbours
- Natural light solutions (lightwells, sunken courtyards)
- Whether a full habitable fit-out is required
How Much Does a Garage Conversion Cost?
£10,000 – £45,000Quick answer (updated October 2026): A garage conversion typically costs £10,000–£45,000 in 2026. Converting a single garage to a room costs about £10,000–£25,000 (£600–£1,400 per m²), and a double garage £18,000–£40,000, with more for an en-suite or kitchen.
Garage conversions offer outstanding value for money — the structure already exists, so you're paying for the internal fit-out rather than new construction. A single garage (around 15–18 m²) converted to a bedroom, home office or playroom is one of the most affordable ways to add a usable room.
Most garage conversions don't need planning permission (they fall under permitted development) but do require building regulations sign-off for insulation, ventilation, fire safety and structural checks.
| Type | Typical Cost | Cost per m² |
|---|---|---|
| Single Garage to Room | £10,000–£25,000 | £600–£1,400 |
| Single Garage + En-Suite | £18,000–£35,000 | £1,000–£2,000 |
| Double Garage to Room | £18,000–£40,000 | £600–£1,400 |
| Double Garage + Kitchen / Living | £25,000–£55,000 | £800–£1,800 |
What Affects the Cost?
- Whether the floor needs raising or insulating (suspended floor adds cost)
- Wall insulation: cavity fill vs internal dry lining
- Replacing the garage door with a window and wall
- Plumbing for a toilet or bathroom
- Heating — extending existing system vs electric underfloor
- Standard of finish: basic bedroom vs high-spec kitchen/living
- Structural condition of existing walls and roof
How Much Does a Garden Room or Annexe Cost?
£15,000 – £100,000Quick answer (updated October 2026): Garden rooms and annexes typically cost £15,000–£100,000 in 2026: £15,000–£35,000 for a timber-frame garden office, £25,000–£55,000 for a brick-built garden room and £40,000–£100,000 for a self-contained annexe, which needs planning permission.
Garden rooms range from insulated timber-frame garden offices to fully self-contained annexes with their own kitchen and bathroom. A simple garden office or gym is typically delivered as a modular structure and installed within days; a brick-built annexe is a proper construction project with foundations, utilities and planning permission.
A self-contained annexe for a dependent relative usually needs planning permission (it's a separate dwelling). A garden room/office used as an extension of the home normally falls under permitted development if it doesn't exceed 50% of the garden area.
| Type | Typical Cost | Notes |
|---|---|---|
| Timber Frame Garden Room / Office | £15,000–£35,000 | Usually no planning needed |
| Insulated Garden Studio (modular) | £20,000–£45,000 | Fast installation, good insulation |
| Brick-Built Garden Room | £25,000–£55,000 | More permanent, may need planning |
| Self-Contained Annexe | £40,000–£100,000 | Planning permission required |
What Affects the Cost?
- Structure type: modular timber vs bespoke brick build
- Insulation specification (heated all-year vs summer use only)
- Plumbing — adding a toilet or kitchen is a major cost jump
- Electrical connection and consumer unit
- Foundation type: ground screws vs concrete strip or slab
- Planning permission requirements (annexes always need it)
- Access across the garden for machinery
How Much Does a Conservatory or Orangery Cost?
£10,000 – £80,000Quick answer (updated October 2026): A conservatory or orangery typically costs £10,000–£80,000 in 2026: from £10,000–£20,000 for a uPVC conservatory with a polycarbonate roof to £35,000–£80,000 for an orangery with brick piers and a roof lantern.
A conservatory uses a largely glazed structure (roof and walls), while an orangery has solid brick or masonry walls with a glazed roof section or lantern — making it feel more like a proper room extension. Both are typically installed under permitted development without planning permission for most houses.
Modern thermally efficient aluminium or timber conservatories and orangeries are significantly more liveable year-round than older uPVC polycarbonate-roofed structures. Budget accordingly — the cheapest options tend to be unusable in summer or winter.
| Type | Typical Cost | Notes |
|---|---|---|
| uPVC Conservatory (polycarbonate roof) | £10,000–£20,000 | Cheapest but poor thermal performance |
| uPVC Conservatory (glass roof) | £18,000–£30,000 | Better comfort year-round |
| Aluminium Conservatory | £20,000–£45,000 | Slim frames, modern look |
| Orangery (brick piers + lantern) | £35,000–£80,000 | Most room-like, highest quality |
What Affects the Cost?
- Frame material: uPVC vs aluminium vs timber
- Roof type: polycarbonate vs glass vs solid insulated roof
- Size and shape (L-shaped or bespoke designs cost more)
- Underfloor heating addition: £2,000–£6,000
- Bi-fold or sliding doors on the internal connection
- Foundation type and existing patio level
- Electrical works, lighting and sockets
How Much Does a Barn Conversion Cost?
£1,200–£4,000+ per m²Quick answer (updated October 2026): Barn conversions typically cost £1,200–£4,000+ per m² in 2026, depending on the condition of the structure and the specification. For a 200 m² barn that is roughly £240,000–£360,000 for a basic conversion and £360,000–£500,000 for a mid-range habitable finish.
Barn conversions create characterful rural homes but are notoriously difficult to cost accurately — the existing structure's condition can vary from sound to near-derelict. A barn in good structural condition with solid walls and a sound roof will be much cheaper to convert than one requiring significant structural repair.
Remote rural locations add cost: longer supply chains, contractor travel time, difficulty getting machinery to site, and often the need for new septic tanks, boreholes and off-grid utilities. Planning consent under Class Q permitted development rights has specific conditions — always check with the local authority.
| Specification | Cost per m² | Typical Total (200 m²) |
|---|---|---|
| Basic (structure repairs + shell) | £1,200–£1,800 | £240,000–£360,000 |
| Mid-Range (habitable finish) | £1,800–£2,500 | £360,000–£500,000 |
| High Spec (premium throughout) | £2,500–£4,000+ | £500,000–£800,000+ |
What Affects the Cost?
- Condition of the existing structure — walls, roof, timbers
- Listed building status — adds cost through materials restrictions
- Off-grid utilities: septic tank (£5,000–£15,000), borehole (£8,000–£20,000)
- Bat surveys and ecology requirements (common for rural barns)
- Insulation: achieving Building Regs U-values in solid stone walls
- Access and contractor travel time to rural sites
- Floor area — larger barns have better economies of scale
How Much Does It Cost to Build an Apartment Block?
£1,800–£4,000+ per m²Quick answer (updated October 2026): Apartment blocks typically cost £1,800–£4,000+ per m² (GIA) to build in 2026: about £1,800–£2,600 per m² for a small three-to-four storey block and £2,000–£3,000 per m² for a medium block, with height thresholds for sprinklers and stairs adding cost.
Residential apartment blocks are developer projects with complex M&E (mechanical and electrical) requirements, fire compliance, accessibility, and often a concrete or steel frame. Costs per m² are higher than houses of equivalent spec due to corridors, lifts, communal areas, and building safety compliance (especially post-Grenfell).
Height thresholds drive cost. In England, new blocks of flats over 11 m need sprinklers, and buildings 18 m and over face a ban on combustible external wall materials and (for new schemes) a second staircase requirement. Lift requirements depend on accessibility standards and local plan policy. Wales and Scotland have their own rules — get fire and accessibility strategy advice early.
| Block Type | Cost per m² (GIA) | Notes |
|---|---|---|
| Small block, 3–4 storeys (4–8 units) | £1,800–£2,600 | Lift depends on accessibility and planning policy |
| Medium block, 4–6 storeys (8–20 units) | £2,000–£3,000 | Usually includes a lift; concrete frame |
| High spec city apartments | £2,800–£4,000+ | Concierge, premium cladding, amenities |
What Affects the Cost?
- Building height — sprinklers (over 11 m), a second staircase (18 m+) and lifts add significant cost
- Frame type: timber frame (lower storeys) vs RC concrete frame
- External walls — combustible materials are banned on residential buildings 18 m and over
- Ground conditions and basement car parking
- M&E complexity: communal heating, MVHR, EV charging
- S106 / CIL obligations (affordable housing contributions)
- Specification of individual units (kitchens, bathrooms, flooring)
How Much Does a Commercial Fit-Out Cost?
£400–£3,500 per m²Quick answer (updated October 2026): Commercial fit-outs typically cost £400–£3,500 per m² in 2026, depending on use: about £500–£1,000 per m² for a Cat A office, £800–£2,000 for Cat B, £600–£1,800 for retail and £1,500–£3,500 for a restaurant or bar.
Commercial fit-out costs vary enormously by use type. A warehouse needs very little internal fit-out, while a restaurant requires an industrial kitchen, extract ventilation, wet areas and often bespoke joinery. The shell and core condition of the existing building is also critical — a new-build shell needs full M&E, while a recently vacated Cat A office may already have services in place.
Cat A is the landlord's base fit-out (ceilings, raised floors, basic M&E); Cat B is the tenant's full fit-out (partitions, kitchen, meeting rooms, branding). Most commercial projects are Cat B.
| Use Type | Cost per m² | Notes |
|---|---|---|
| Cat A Office Fit-Out | £500–£1,000 | Landlord base fit; basic M&E |
| Cat B Office Fit-Out | £800–£2,000 | Full tenant fit-out, meeting rooms |
| Retail (shell & core to trading) | £600–£1,800 | Wide range by brand and spec |
| Restaurant / Bar | £1,500–£3,500 | Kitchen extract, wet areas, joinery |
| Industrial / Warehouse | £400–£900 | Minimal fit-out; mainly structure |
What Affects the Cost?
- Existing shell condition — Cat A vs bare shell adds £300–£500/m²
- M&E complexity: commercial kitchens, HVAC, data infrastructure
- Partition density and acoustic requirements
- Accessibility compliance (Equality Act 2010 and Approved Document M)
- Fire strategy: sprinklers, compartmentalisation, fire doors
- Bespoke joinery and branding elements
- Programme speed — fast-track work costs a premium
Common Questions About UK Building Costs
Why do costs vary so much between quotes?
Three contractors quoting the same project often differ by 20–40%. This is normal — different contractors have different overhead structures, different levels of subcontractor relationships, and interpret drawings differently. An independent estimate from a Quantity Surveyor gives you a benchmark to sense-check quotes before you appoint.
Do these costs include VAT?
No — all figures on this page exclude VAT. Most residential building work is charged at 20% VAT. New build residential construction is typically zero-rated. Some alteration works to listed buildings may be eligible for the reduced 5% VAT rate. Always confirm with your contractor and accountant.
What professional fees should I budget for on top?
Architect fees typically run at 5–12% of construction cost depending on the scope of service. Structural engineer fees: £1,500–£5,000 for residential, more for commercial. Building control: £500–£2,000. Quantity Surveyor: 1–3% of project value. Planning application: £548 for a householder application in England (from 1 April 2026), more for major developments. Fees differ in Wales, Scotland and Northern Ireland.
How accurate are these cost estimates?
These figures are indicative — they give you a realistic order-of-magnitude to test feasibility and avoid being completely blindsided. For anything beyond initial budgeting, you need an estimate based on your actual drawings and specification. Accuracy depends on the drawings we work from. Budget estimates from outline drawings are typically within 15–20% of the final cost, planning-drawing estimates within 10–15%, and building-regulation estimates within 5–10%. Clients regularly tell us our figures align closely with the tenders they receive.
How much contingency should I allow?
As a rule of thumb: 10% for well-defined projects on cleared sites; 15–20% for refurbishments and conversions where hidden conditions are possible; 20%+ for basement projects and listed buildings. Contingency is not a buffer for scope changes — it's insurance against genuinely unforeseen events. Don't spend it unless you have to.