Costs & Pricing

How Much Does It Cost to Build a House in the UK?

11 Feb 2026 ~12 min read
Back to Knowledge Hub

Introduction

Building your own home is one of the most ambitious and rewarding projects you can undertake. Whether you are drawn to the idea of designing a house that perfectly suits your family, securing a property for less than open-market prices, or simply creating something truly unique, self building offers a level of control and personalisation that buying an existing home can never match. But before you start sketching floor plans or browsing architectural magazines, you need a clear and honest understanding of the costs involved.

The total cost of building a house in the UK depends on dozens of interconnected factors: the price of land in your chosen area, the size and complexity of the design, the specification of materials and finishes, the construction method you select, and the professional fees required to get the project from concept to completion. Underestimating any one of these elements can lead to budget shortfalls, project delays and significant stress.

In this guide, we break down every major cost category you will encounter when building a new home in 2026. We provide realistic price ranges based on current market data, explain the key variables that drive costs up or down, and offer practical advice on how to keep your project on track financially. For a more detailed guide focused specifically on the self-build route, see our companion article on self build costs in the UK, which covers the process from plot purchase through to final snagging.

Average New Build Costs by Size

The table below sets out typical build cost ranges for different house sizes in 2026. These figures represent construction costs only and cover everything from foundations through to internal decoration, including mechanical and electrical installations. They assume a mid-range specification with standard fixtures and fittings, built using traditional masonry construction on a site with reasonable access and straightforward ground conditions.

House Type Typical Size (m²) Build Cost Range
2-bed bungalow 70–90m² £120,000 – £200,000
3-bed detached 100–130m² £170,000 – £300,000
4-bed detached 140–180m² £250,000 – £450,000
5-bed executive 200–280m² £400,000 – £700,000+

Important: These figures exclude land costs, which can double or even triple the total project budget depending on your location. They also exclude professional fees, planning costs and external works such as driveways, landscaping and boundary treatments. Always budget for the complete picture, not just the bricks and mortar.

It is worth noting that bungalows tend to be more expensive per square metre than two-storey houses of the same floor area. This is because the foundation and roof costs, which are two of the most expensive elements in any build, are proportionally larger relative to the overall habitable area. A two-storey house shares a single foundation footprint and a single roof structure across two floors, making it significantly more cost-efficient per square metre of living space.

At the other end of the scale, executive-style homes with features such as double-height entrance halls, basement levels, extensive glazing and high-end finishes can comfortably exceed £3,000 per square metre. The cost ranges above reflect mainstream self-build projects rather than premium or architect-designed bespoke homes.

Land Costs and Where to Find Plots

For most self builders, the cost of land represents the single largest line item in the project budget. Unlike build costs, which are broadly predictable once you have drawings and a specification, land prices are driven by location, local demand, plot size and the planning status of the site. Two seemingly similar plots just a few miles apart can differ in price by tens of thousands of pounds.

Average Land Prices

Land prices in the UK vary enormously by region. Outside London and the South East, a building plot for a single dwelling typically costs between £50,000 and £100,000, though bargains can be found in less sought-after areas of Wales, the North of England and Scotland, where plots occasionally come to market for under £30,000. In popular commuter towns across the South East, expect to pay between £150,000 and £300,000 for a standard plot. In London and prime Home Counties locations, plot prices of £200,000 to £500,000 or more are not uncommon.

The planning status of the land is critical to its value. A plot with full planning permission for a residential dwelling will always command a premium over land sold without consent or with only outline permission. Agricultural land without any planning permission is worth a fraction of residential building land, but securing a change of use can be a lengthy and uncertain process.

Finding Land

Finding a suitable plot is often the hardest part of the self-build journey. The most common sources include online plot-finding portals and property auction sites, which list land with and without planning permission across the UK. Local authority self-build registers, which councils are required to maintain under the Self Build and Custom Housebuilding Act 2015, can also be a useful starting point, though the quality and usefulness of these registers varies considerably from one authority to another.

Word of mouth remains one of the most effective ways to uncover off-market opportunities. Letting local estate agents, farmers, landowners and parish councils know that you are looking for a plot can yield results that never appear on the open market. Specialist plot-finding services will search on your behalf for a fee, which can be worthwhile if your time is limited or you are searching in a particularly competitive area. You should also monitor planning applications in your target area, as sites with recent residential approvals sometimes come to market shortly after consent is granted.

Build Cost Breakdown

Understanding how your build budget is distributed across the different elements of construction is essential for effective cost management. The percentages below are typical for a mid-range detached house built using traditional masonry construction. Timber frame, SIPs (structural insulated panels) and other modern methods of construction may shift these proportions, but the overall total tends to be broadly similar.

Foundations and Substructure

The foundations and substructure, which include groundworks, excavation, concrete foundations, ground-floor slab, below-ground drainage and damp-proof course, typically account for 10 to 15 per cent of the total build cost. On a straightforward site with good load-bearing soil, standard strip foundations will be the most economical option. However, if your site investigation reveals poor ground conditions, a high water table, filled ground or proximity to large trees, you may need piled foundations, raft foundations or other engineered solutions that can add significantly to this cost element. A thorough ground investigation before you begin is always money well spent, as foundation problems discovered during construction are far more expensive to resolve than those identified at the design stage.

Superstructure (Walls, Floors, Roof)

The superstructure, encompassing external walls, internal load-bearing walls, upper floors, the roof structure, roof coverings, windows and external doors, represents the largest single cost category at 25 to 30 per cent of the build budget. The choice of wall construction has a major bearing on cost. Traditional cavity masonry (brick and block) remains the most common approach for self builders, but timber frame, insulated concrete formwork (ICF) and SIPs panels are increasingly popular, particularly for their speed of erection and improved thermal performance. Roof design also influences cost significantly: a simple duo-pitched roof is far cheaper to build than a complex roof with multiple hips, valleys, dormers and rooflights.

Mechanical and Electrical

Mechanical and electrical (M&E) installations, covering heating systems, plumbing, hot and cold water, electrical wiring, lighting, ventilation, fire alarms and any renewable energy systems, typically represent 15 to 20 per cent of the total build cost. The specification of your heating system is a particularly important cost driver. A standard gas boiler with radiators is the most affordable option, while underfloor heating, air-source heat pumps and integrated smart home systems will push M&E costs towards the upper end of this range. With the Future Homes Standard on the horizon, new builds are increasingly expected to incorporate low-carbon heating solutions, which has implications for both capital cost and long-term running costs.

Internal Finishes

Internal finishes cover plastering, decoration, floor finishes, kitchen installation, bathroom and en-suite fit-outs, joinery (doors, skirting, architraves, staircases), tiling and all fixtures and fittings. This category typically accounts for 15 to 20 per cent of the build cost, but it is the area where specification choices can cause the greatest cost variation. A functional kitchen from a mainstream supplier might cost £8,000 to £15,000 fitted, while a bespoke, handmade kitchen can easily exceed £40,000. Similarly, bathroom costs can range from £3,000 for a basic suite to £15,000 or more for premium sanitaryware and large-format tiling. Careful specification management at the design stage is essential to keeping this element under control.

External Works

External works include driveways, paths, patios, boundary walls and fences, landscaping, external lighting, bin stores and any detached structures such as garages or garden buildings. This element typically accounts for 5 to 10 per cent of the build cost, though it can be higher if you are building a long private driveway, installing extensive hard landscaping or constructing a detached double garage. Many self builders underestimate external works costs or defer them to a later date, but they should always be included in your initial budget to avoid an unfinished-feeling property at the end of the build.

Professional Fees

Building a house requires the expertise of several professionals whose fees must be factored into your overall budget. These costs are separate from the physical construction and can collectively add 15 to 20 per cent to the build cost, depending on the complexity of the project and the level of service you require.

An architect or architectural designer will typically charge between 7 and 12 per cent of the total build cost for a full service from concept design through to completion on site. If you only need drawings for planning and building regulations, with limited site involvement, fees are more likely to fall in the 3 to 7 per cent range. A structural engineer is essential for designing foundations, steelwork and any load-bearing elements, with fees typically ranging from £1,500 to £5,000 for a new-build house depending on complexity.

Engaging a Quantity Surveyor or professional estimator at an early stage is one of the most effective ways to control costs. At First4Estimating, our detailed estimates start from £350 and give you a comprehensive, itemised breakdown of your anticipated construction costs before you commit to a contractor. This allows you to benchmark quotations, identify potential savings and avoid the costly surprises that derail so many self-build budgets. Learn more about our estimating services or explore how a cost plan can guide your project from feasibility through to final account.

Other professional fees to budget for include building control approval (either local authority or private approved inspector), a structural warranty provider such as NHBC, LABC or Premier Guarantee (required by most mortgage lenders), and CDM (Construction Design and Management) compliance if your project falls within the scope of the CDM Regulations.

Planning and Building Control

Securing planning permission and building regulation approval are essential prerequisites for any new-build house. The costs associated with these statutory processes should be budgeted for from the outset, as they are unavoidable and can occasionally escalate if applications are refused or conditions prove difficult to discharge.

A planning application for a new dwelling in England currently costs £578 (or £462 in Wales). If your project involves multiple dwellings, the fee increases accordingly. Many self builders choose to submit a pre-application enquiry first, which typically costs between £200 and £600 depending on the local authority, to gauge the likelihood of success before investing in full architectural drawings. The planning process itself can take 8 to 13 weeks for a standard application, or longer if the application is called in or goes to committee.

The Community Infrastructure Levy (CIL) is charged by many local authorities on new residential development to fund local infrastructure. CIL rates vary significantly between authorities, from zero in some areas to over £200 per square metre in parts of London and the South East. Self builders can claim an exemption from CIL provided they intend to occupy the property as their principal residence for a minimum of three years, but the exemption must be applied for before construction begins. Section 106 obligations may also apply on larger sites or in specific planning contexts.

Building regulation approval is required regardless of planning status and ensures your house meets the minimum standards for structural safety, fire protection, energy efficiency, accessibility and drainage. Building control fees for a new-build house typically range from £1,000 to £2,500 depending on the size of the dwelling and the provider you choose.

Self Build vs Developer Build

One of the first decisions to make when considering building a new home is whether to go down the self-build route or purchase a newly built house from a volume developer. Both approaches have distinct advantages and drawbacks in terms of cost, control, timeline and overall experience.

The primary financial advantage of self building is cost. By managing the process yourself, whether you act as the main contractor or employ a project manager, you can typically build a house for 10 to 30 per cent less than the cost of buying an equivalent new-build property on the open market. This saving arises because you are not paying for the developer's profit margin, marketing costs or land banking premium. You also have complete control over the specification, meaning you can invest in the areas that matter most to you and economise elsewhere.

On the other hand, buying from a developer is significantly less stressful and time-consuming. The house is already designed, approved and built (or at least under construction), and you benefit from structural warranties, established estate infrastructure and a known completion date. For those with limited time, limited construction knowledge or a low tolerance for risk, a developer-built home may be the more practical choice.

Self building gives you full control over design, layout, orientation, materials and energy performance. You can create a home that is tailored precisely to your lifestyle and future needs. However, this control comes with responsibility: you will need to manage budgets, timelines, contractors and the inevitable challenges that arise during any construction project. For detailed guidance on the self-build process, including how to manage contractors and control costs, visit our dedicated self build page.

Key statistic: Self builders in the UK typically save between 10 and 30 per cent compared to the market value of an equivalent new-build home, according to industry surveys. On a £400,000 house, that represents a potential saving of £40,000 to £120,000.

Regional Cost Comparison

Build costs vary across the UK due to differences in labour rates, material transport distances and local market conditions. London and the South East consistently command the highest build costs, driven by elevated labour rates and intense competition for skilled tradespeople. The North of England, Wales and Northern Ireland tend to offer the lowest build costs, though this advantage is sometimes offset by higher transport costs for materials in more remote areas.

The table below provides indicative build costs per square metre and an estimate for a 130m² three-bedroom detached house at a mid-range specification in each region. These figures cover construction costs only and exclude land, professional fees and external works.

Region Build Cost per m² 130m² 3-Bed Estimate
London £2,200 – £3,000 £286,000 – £390,000
South East £1,900 – £2,600 £247,000 – £338,000
South West £1,700 – £2,300 £221,000 – £299,000
Midlands £1,500 – £2,100 £195,000 – £273,000
North £1,400 – £1,900 £182,000 – £247,000
Wales £1,400 – £1,900 £182,000 – £247,000
Scotland £1,450 – £2,000 £189,000 – £260,000
Northern Ireland £1,350 – £1,850 £176,000 – £241,000

These figures are indicative and should be used for initial budgeting only. Actual costs will depend on your specific design, specification and site conditions. For accurate, project-specific pricing, we recommend commissioning a professional estimate from your drawings. We offer estimating services across the UK, including dedicated support for self builders in London and all other regions.

Financing a Self Build

Financing a self-build project is fundamentally different from buying an existing property with a standard mortgage. Self build mortgages are specialist products designed to release funds in stages as the build progresses, rather than as a single lump sum on completion. Understanding how these products work is essential to ensuring your project has adequate cash flow from start to finish.

There are two main types of self build mortgage. Arrears stage payment mortgages release funds after each construction stage is completed and inspected. This means you need to fund each stage upfront from your own resources or a bridging facility, then claim back from the lender once the work is signed off. Advance stage payment mortgages release funds at the beginning of each stage, before the work is carried out. These are more expensive in terms of interest rates but far easier to manage from a cash flow perspective, particularly if you do not have substantial savings to draw upon.

Most self build mortgage lenders require a deposit of 25 per cent or more, calculated against either the land cost plus build cost or the projected value of the completed property, depending on the lender. Some specialist lenders will accept lower deposits of 15 to 20 per cent, though these products typically carry higher interest rates and more restrictive terms.

One significant financial advantage of building a new home is the ability to reclaim VAT on the majority of building materials and contractor costs. Under the DIY Housebuilders VAT Reclaim Scheme (VAT Notice 431NB), self builders constructing a new dwelling for their own occupation can claim back VAT on eligible goods and services. This can represent a saving of up to 20 per cent on materials costs and is a substantial benefit that is unique to new-build self-build projects. The claim must be submitted within six months of the building control completion certificate being issued.

Keeping Costs Under Control

Controlling costs on a self-build project requires discipline, planning and access to reliable cost information from the earliest stages of the project. The following strategies are recommended by our team of Quantity Surveyors and estimators based on decades of experience working on residential new-build projects across the UK.

Get a detailed estimate early. Before you commit to a contractor, commission an independent, professional estimate from your drawings. This gives you a comprehensive benchmark against which to evaluate builder quotations and highlights any areas where costs are higher than expected while you still have time to make design changes. Our budget estimates are specifically designed for this purpose and can be prepared from planning drawings in just a few working days.

Use a Quantity Surveyor. A QS provides ongoing cost management throughout the project, from initial feasibility through to final account. They will prepare detailed cost plans, value interim payments, manage variations and ensure that you only pay for work that has been properly completed. The cost of a QS is typically recovered many times over through savings and dispute avoidance.

Consider a fixed-price contract. If you are employing a main contractor, negotiate a fixed-price or lump-sum contract wherever possible. This transfers the risk of cost overruns to the contractor and gives you certainty over the final construction cost, provided the scope of work does not change. Ensure the contract is based on a detailed specification and drawings to minimise the potential for variations.

Maintain a contingency of 10 to 15 per cent. No matter how carefully you plan, unexpected costs will arise during construction. Ground conditions may be worse than anticipated, material prices may increase, or you may decide to upgrade certain elements as the build progresses. A contingency fund of 10 to 15 per cent of the total build cost provides a sensible financial buffer.

Avoid scope creep. One of the most common causes of budget overruns on self-build projects is scope creep: the gradual expansion of the project brief through additional features, upgraded specifications and last-minute design changes. Every change has a cost, and the cumulative effect of multiple small changes can be substantial. Make decisions early, commit to your specification and resist the temptation to upgrade once construction is underway.

For projects where detailed cost management is essential, our bill of quantities service provides a fully measured and priced document that forms the basis for competitive tendering and ongoing cost control throughout the construction phase.

Tip: The earlier you invest in professional cost advice, the more money you will save. An estimate costing a few hundred pounds can prevent cost overruns of tens of thousands. Contact us to discuss your project.

Common Questions

Building a House Cost FAQ

Building a house typically costs between £1,400 and £2,500 per square metre for the structure alone, depending on specification and location. When compared to average UK house prices, self building can be 10 to 30 per cent cheaper than buying an equivalent new build on the open market. However, the total cost depends heavily on land prices, which vary enormously by region and are often the single biggest variable. For a full cost breakdown tailored to your project, get in touch with our team.

A standard 3 to 4 bedroom house typically takes 12 to 18 months to build from breaking ground to completion. Before construction begins, you should allow a further 6 to 12 months for design development, planning applications and building regulation approval. Complex architectural designs, challenging ground conditions or periods of poor weather can extend the overall programme significantly. Our cost planning service can help you map out both costs and timelines from the outset.

Yes. Self build mortgages are available from several specialist lenders in the UK. Unlike a standard mortgage, self build mortgages release funds in stages as the build progresses, either in arrears after each stage is completed or in advance before each stage begins. You will typically need a deposit of 25 per cent or more, and lenders will assess both your personal finances and the viability of your build project. Having a professional cost estimate or cost plan strengthens your mortgage application considerably. Visit our self build page for more guidance.

Need a Professional Estimate?

Our qualified Quantity Surveyors can provide a detailed, accurate estimate for your project. Send us your plans today.